To implement the conveyor belt, it is necessary to keep track of the containers being transported; in addition, there are two buttons, one for starting and one for stopping.
In this chapter, we will learn about two new tools in the PLC programming software we use for our exercises. These tools are called "Call Function" and "Special Bit". Both tools...
Once the counter has been addressed, we will proceed to the automation of the conveyor belt, which is required to transport tortillas from the cooking oven to
There are various industrial processes where the product has to be transported through its different manufacturing stages, which necessarily requires a conveyor belt, which is precisely
Next, we will see the OR function implemented with a lamp that must be on when one, the other, or both of the buttons controlling it are pressed. The corresponding table for this
The following example involves an AND function, so a lamp is required to turn on if and only if two buttons that the example will have are being pressed.
There are several ways to program a PLC, and for example, in Chapter 7 we covered the intuitive method. In this chapter, we will discuss a formal method.
The basic concepts covered in Chapter 6 (“Logical Functions of a PLC”) provide us with the necessary tools to automate any type of industrial machinery, since they are
Programming a PLC requires using a specific language, which is generally only understood by the PLC itself. The programming language for each PLC varies.