The term “Real-time control” is defined as “relevant to perform a calculation operation during the time that the physical process transpires,” in our context it refers to the response of the control system to changes in the process.
Strictly speaking, a real-time system is one that does not introduce delays or dead time between the reception of the measurement of the process variables and the control signal.
In reality, all control systems introduce small delays to the process. The introduction of small amounts of delay into the process without affecting the measurement or performance of the process is known as a real-time control system.
Many process control systems are considered real-time. Figure 7 shows a real-time control system because the only delay considered is the information processing time in the process controller.

Fig.7 – Real-time control system
Figure 8 shows a simple SCADA system with the master unit scanning three RTUs. The master unit queries RTU 1 for the flow through FT101, then queries the other RTUs for the flow on their transmitters FT102 and FT103.
The scan interval is the time between one conversation with an RTU and the next conversation with the same RTU. It's clear that this method used by the SCADA system is slow and will introduce a delay.

Fig. 8 – Simple SCADA with the master unit scanning three RTUs
Figure 9 shows the delay. The decision regarding how the scan time may affect the process can only be made by someone familiar with the process. During the initial design phase of the SCADA system, the scan interval can be selected to minimize the effects of time delays.

Fig. 9 – Communication delay in RTU's
In particular, systems for indicating statuses or alarms must be designed so that the time delays between alarm detection and operator acknowledgment are minimal. Many examples can help illustrate this. For instance, a equipment failure has been detected. The SCADA system alerts the operator to the existing alarm condition. The operator then responds to return the process to its nominal state.
Example 1, of an out-of-bounds condition:
An oil discharge pump has stopped at location 10-22. Since the pump feeds a reservoir, the flow to this tank has stopped. An alarm signal appears: “Pump 10-22 Stopped.” The expected response is that on the next field visit, the operator will spend sufficient time on-site to determine the cause of the pump failure. They can write a description of the failure and call maintenance personnel to repair the problem. Economically feasible time is on the order of hours to days.
Example 2, of an out-of-bounds condition:
A submersible pump located in section 6-33 has stopped.
The alarm signal is “Pump 6-33 Stopped”
Expected answer: Submersible pumps are expensive and typically pump high flow rates. Therefore, pump downtime results in significant financial losses for the company. Consequently, equipment repair time should be minimized.
The economically feasible time for this response is on the order of minutes and can be at most one hour.
Example 3, of an out-of-bounds condition:
The connection between the G150 generator and the power transmission line has been opened.
Alarm signal “Generator G150 open connection”
Expected answer: The generator is essential for the plant's operation. Therefore, it must be reconnected as soon as possible.
Economically feasible time is on the order of seconds. At most 5 seconds.
These examples make it clear that the design of the Scada system depends on the conditions to be controlled in the process and must be adjusted to have a shorter response time than the process so that the Scada system is recognized as a "Real Time" system.
Help us grow
Finally, if you are determined to learn Industrial Automation and advance your professional career, you may be interested in our Premium courses:
– Click to see all our courses at MyAutomationClass.com
- Course: «"Become a PLC expert in 60 days, from basic to pro"»
- Course: «"PID Controllers Master Class – 100% practical"»
- Course: «"How to create SCADA/HMI projects from scratch with InTouch"»
- Course: «"PID Tuning Ultimate: The Definitive Course for Tuning"»
- Course: «"Practical Process Modeling: Definitive Steps to Becoming an Expert"»
- Program: «"The Ultimate Process Control Formula" (All-inclusive: PID Control, Tuning, and Modeling)