Demonstrating the Advantages
We can show some examples of how the DCS workflow will allow us to save and drastically reduce the implementation and maintenance time of our applications, compared to systems involving PLC/HMI/SCADA.
This is much easier to explain by following the sequence of tasks in the development of a project:
Step 1: System Design
Engineers or technicians using PLC/SCADA systems must plan system integration with the HMI, alarm system, controller communication, and other controllers for each new project. Every control variable or tag must be manually assigned to each component and documented in the engineering documentation for the entire project. This manual process is time-consuming and prone to human error. Engineers must also learn multiple software programs, which can take weeks to master.
DCS Approach: As the designed logic is implemented, the alarm system, HMI, and communication systems are automatically configured. Generally, only one configuration software is needed to update a single database used for all system components. As the control engineer designs the control logic, the rest of the system is also configured in parallel. The simplicity of this process and its environment allows engineers to adapt to and understand the development environment within a few days. This results in savings of between 15% and 25%, depending on the size of the HMI and the alarm system being designed.
Step 2: Programming
The control logic, communication system, and HMI in PLC/SCADA systems are programmed independently. Control engineers are responsible for integrating and linking the multiple databases created within the system. Items (tags) must be manually duplicated in each system element: data scaling, alarm levels, and tag location (addressing). Only basic control is available. Extending functionality requires creating it for each application, for example, feedforward, tracking, self-tuning, etc. This leads to non-standard applications that are tedious to operate and maintain. Redundancy is used very little or in a very simplified way in PLCs. One reason for this is the difficulty in configuring and managing redundancy for the application.
The way DCSs work: when the control logic is developed, the HMI overlays or faceplates, alarms, and communication system are automatically configured. The faceplates automatically appear with the alarm levels and escalation settings of the control logic. These elements, which contain critical system data, are configured only once. This is analogous to having a calendar on your desktop and your phone automatically syncing instead of having to re-enter all appointments on both devices. Redundancy is configured quickly and easily in the software, almost with a simple click of a button. The current potential ranges from 15 to 45%.
Step 3: Commissioning and Operation
Testing a PLC/HMI system is typically done on-site after all the wiring is complete and the operations manager asks, "Why isn't the system up and running yet?" Offline simulation isn't possible, and doing so requires a significant programming effort to write code that simulates the application being controlled. Due to the high costs and complex programming, this is rarely done.
The benefit of a DCS: A DCS system comes with the ability to automatically simulate the process based on the logic, HMI, and alarms that will be used by the plant operator. In some cases, special software is used to model the entire plant and provide a near-perfect simulation of the entire process, including the possibility of virtual walkthroughs for operator training.
This saves significant time, as the programming can be checked before wiring begins. The potential savings range from 10 to 20% depending on the complexity of the setup and commissioning.
Step 4: Troubleshooting
A PLC/SCADA system offers excellent troubleshooting tools. For example, if an input or output is connected to the system, the control logic will be programmed using that point without issue. However, when this point is updated, has the HMI also updated this point? Have the alarms been reconfigured? The logic programming is rarely shown to the operator since it's all separate software and never intuitive for the operator to understand.
The way a DCS works is that all information is automatically available to the operator regarding the logic being executed by the controllers. This greatly reduces the time it takes to identify problems and get the system up and running again. Diagnostics of field devices (HART or FieldBus) are available from the operator consoles. This saves between 10 and 40%, depending on the size of the HMI and the alarm system.
Step 5: Ability to change to meet process requirements
PLC/SCADA: Changing the control logic to meet application requirements is relatively easy. The problem arises when these additional requirements or new functionalities must be integrated with the operator stations. Again, if an input is changed to a new address or tag, the change must be made manually throughout the entire system.
DCS: Adding or changing logic in the system is also easy. In many cases, it's even easier when the logic has been implemented based on templates or models. When these changes are made, the data in the control logic is automatically propagated to all aspects of the system. This means far fewer errors and the entire system can be changed with just a single logic change.
Potential savings: between 20 and 25%. This directly impacts the continuous improvement of programs.
Step 6: System Documentation
PLC/SCADA system documentation is based on creating separate documentation for each part of the system. As each element changes, the documentation should be updated for each element to keep it current. Again, this rarely happens, causing many problems with future changes and troubleshooting.
In a DCS, when the control logic is modified, documentation for all aspects of the system is automatically generated. This can save between 30 and 50% depending on the nature of the system's installation. These savings directly minimize downtime.
These time savings are based on typical costs associated with a system using approximately 500 I/O, two controllers, one workstation, and 25 PID control loops.
Conclusion:
If you are using, or planning to use, PLCs and HMI/SCADA to control your continuous or discrete process, your application could be a candidate for a DCS-based solution to help reduce costs and improve control. The developer can focus on adding functionality that will provide greater benefits, shortening the return on investment period. The gap between DCS and PLC/SCADA approaches is significant, although we can observe similarities at the hardware level, with the single database being the core benefit of a DCS.
Help us grow
Finally, if you are determined to learn Industrial Automation and advance your professional career, you may be interested in our Premium courses:
– Click to see all our courses at MyAutomationClass.com
- Course: «"Become a PLC expert in 60 days, from basic to pro"»
- Course: «"PID Controllers Master Class – 100% practical"»
- Course: «"How to create SCADA/HMI projects from scratch with InTouch"»
- Course: «"PID Tuning Ultimate: The Definitive Course for Tuning"»
- Course: «"Practical Process Modeling: Definitive Steps to Becoming an Expert"»
- Program: «"The Ultimate Process Control Formula" (All-inclusive: PID Control, Tuning, and Modeling)
- Course: How to Learn Industrial Instrumentation, Easily (Complete)
If you have any questions, contact us via Facebook Messenger
Until next time. COMMENT AND SHARE! I'll be happy to answer your questions.


José Carlos, congratulations on your comment about control systems such as PLCs and DCS systems. I can tell you that I worked for 24 years at the Arauco Pulp Mill in both of its plants. I was the Superintendent of Control, Instrumentation, and Digital Communications. I understand very well the advantages and differences between control systems with PLCs and DCS. I am currently a professor and lecturer on control topics, not only digital systems like PLCs and DCS, but also process control. For example, I work on the control and process control of large boiler generators: three generating boilers of 150 tons/hour (45 kg/cm² and 550 °C) and the largest of 1350 tons/hour at the same pressures and temperatures. These are truly powerful systems, which is why they have safety systems. I'm happy to exchange ideas; I have a lot of material for presentations on control and process control. What I've noticed is that there are professionals who teach classes but have never had field experience. There are control courses that an engineer who has never been in the field cannot teach; in those cases, they deliver the same information as is in the classroom. books with information that cannot be delivered if you have never seen a transmitter, a control valve, a PLC, or a DCS.
Sincerely,.
Guillermo Núñez Romero
Good evening, esteemed colleagues. I am very pleased with the invaluable information you share through this medium. Please accept my congratulations on your work. If I ever obtain the necessary resources to view and take the courses you offer, which have the potential to be applied to any installation of systems, automation, or control, thank you.
I have no knowledge of PLCs; if I do, I would make a good comment about DCS. Thank you.
Good contribution of information, thank you.
Thanks Roberto