It might surprise us to learn that today a PLC, HMI and SCADA system can cost more than a DCS for the same process and particular application.
Traditionally, DCSs were extensive, expensive, and highly complex systems designed as comprehensive solutions for continuous or discrete (batch) industrial processes. This concept remains true today, and for smaller applications, engineers generally opt for PLC/HMI/SCADA systems to keep costs down.

But what has changed? Integrating independent PLCs, the need for operator interfaces, and monitoring functionalities takes a great deal of time and effort. The point is that efforts are focused on making separate technologies work together, without improving operations, reducing costs, or enhancing the quality or profitability of a plant.
However, a PLC/SCADA system may have all or part of the following list of independent or related databases manually:
- Each controller and its associated I/O
- Alarm Management
- Batch handling, production
- Redundancy at all levels
- Historical
- Asset Optimization
- Management of fieldbus devices (HART, FF, ProfiBus, etc.)
Each of these databases must be manually synchronized for the entire system to function correctly. This is simple after the initial system development. However, it can become an unnecessary complication when changes and/or improvements are made to the system over time, and the larger the changes, the more hours of programming are required to maintain the databases.
Making the changes
Whenever a change is made to one database, the others usually need to be updated to accurately reflect the changes. For example, when I/O signals and control logic are added, it may be necessary to change or add elements to the SCADA/HMI, the historian, and the alarm database. This requires the plant engineer to make the changes in each of the databases, not just one—and to do it correctly!.
In another scenario, a change might be made to an alarm configuration within a control loop. In the PLC world, there is no automatic connection between the PLC itself and the SCADA/HMI. This can become a serious problem during the commissioning of a new application, where alarm limits are constantly being adjusted in the controller to manage the process, while simultaneously attempting to manage alarms and keep the HMI applications updated with the changes made as the operator uses them.
Today, DCSs, sometimes also called "process control systems," are developed to allow for rapid implementation across the entire system by integrating all databases into a single database. A single database is designed, configured, and operated from within the same application.
This can translate into significant cost reductions when using DCS technology compared to PLC/SCADA (or HMI), at least in terms of the cost of the necessary engineering hours. DCS hardware has always been considered expensive, but this is no longer the case. Today, PLC hardware looks like a PLC, and the software can run on standard PCs using the same network, so why the extra cost? Is it the software? While it's true that DCS software makes them more expensive, this is only the case if you purchase software with advanced features (which, frankly, are often not used or needed).
If our concern is a small or medium-sized system, the hardware and software acquisition costs are very competitive with those of a PLC/SCADA system. Therefore, the real difference lies in the associated maintenance and engineering costs, which are improved and simplified with a single database at the heart of a DCS.
Up to this point, one might think that the functionality of a DCS is limited to control loops, while PLCs are geared towards discrete and sequential applications, and that therefore a direct comparison cannot be made. This is ANOTHER MYTH. Today, a DCS is as functional and cost-effective as a PLC for performing discrete and sequential logic.
In it next article We will demonstrate the advantages at every stage of project implementation and control system maintenance. Until next time.
Help us grow
Finally, if you are determined to learn Industrial Automation and advance your professional career, you may be interested in our Premium courses:
– Click to see all our courses at MyAutomationClass.com
- Course: «"Become a PLC expert in 60 days, from basic to pro"»
- Course: «"PID Controllers Master Class – 100% practical"»
- Course: «"How to create SCADA/HMI projects from scratch with InTouch"»
- Course: «"PID Tuning Ultimate: The Definitive Course for Tuning"»
- Course: «"Practical Process Modeling: Definitive Steps to Becoming an Expert"»
- Program: «"The Ultimate Process Control Formula" (All-inclusive: PID Control, Tuning, and Modeling)
- Course: How to Learn Industrial Instrumentation, Easily (Complete)
If you have any questions, contact us via Facebook Messenger
Until next time. COMMENT AND SHARE! I'll be happy to answer your questions.



Very good explanation, very understandable. .
The courses look good, but in my opinion, a bit expensive. However, they provide good information, which is appreciated.
Hi Marcos, thanks for your comment. The cost of our training is only a fraction of the benefit you receive. It's a pleasure to hear from you.
Very good information.
Thank you!!!